© Daniel Hawelka

MIBA Forum

en | de | fr | nl | hu
City, Country Laakirchen, Austria
Year 2014–2017
Client Miba AG
Architect Delugan Meissl Associated Architects
Services Structural Engineering
Facts GFA: 4,620 m² | NFA: 3,450 m² | Gross volume: 33,300 m³ | Height: 10.5 m | Competition: 2014, 1 prize
Awards Holzbaupreis Steiermark 2017, Category: Holzbau grenzenlos

A new learning, technology and customer centre for the producer of engine and automotive parts was built at their headquarters within a 4,000 m² area, offering new offices, meeting and training rooms for 90 employees. The building is composed of two storeys and is arranged around an inner courtyard.

The structure consists of a base in massive construction and a wooden construction as the roof structure. The building in the ground plan is like the geometry of a square courtyard, with length and width of approximately 60 m and 40 m, respectively. The ridge of the roof is 20 m above the street level.

Structural Engineering
Building Information Modelling
Design Technology
Office
Timber
Planning
© B+G
Construction
© B+G
Completion
© Daniel Hawelka