City, Country | Neuhausen auf den Fildern, Germany | |
Year | 2014–2016 | |
Client | Fanuc Robotics Deutschland | |
Architect | GKK+Architekten | |
Services | Structural Engineering Building Physics |
|
Facts | Surface area: approx. 7,600 m² |
The existing FANUC Robotics headquarter was extended by a new training center and a guest house. Simultaneously to the new buildings the previous training and storage areas were converted into office use. A glass linking bridge connects the two functional areas with each other.
The extension of the Fanuc Academy consists of a three-storey building partly with basement with a one-storied connection building between the new building complex and the existing building. The structure is designed as reinforced concrete construction made of in-situ concrete. The connecting bridge with a span of about 19 m is built as a steel structure.